Ocean Container Shop Build

Sawbonz

Well-Known Member
Feb 18, 2014
902
8,608
93
Foothills of Stevens Pass PNW
Once his place was done we moved to another farm for a month and started a huge cleanup project.
For payment I took the scrap metal and some machines. Was going to cut up the machines but the scrap
price tanked so just going to wait or try to sell the machines.

Thinking about building a firewood processor out of this old log loader pump and motor and a huge cylinder from a clark 18k forklift.View attachment 58700View attachment 58701
 

Sawbonz

Well-Known Member
Feb 18, 2014
902
8,608
93
Foothills of Stevens Pass PNW
Milwaukee has a 600 ft lb impact, the big PC is just over 1/2 that.
I went with these cause the price was cheap and got good deals through Lowes. If it has a 320 lb hit that's enough for me. If I need more my IR 1" pneumatic hits at 1200. :D

Speaking of cheep, got this Harbor freight 12" slide chopper for a $100 at their parking lot sale. Just got my blade mounted and ready to start the band room interior build soon.

DSCN3252.JPG
 

dieselfitter

Aspiring impressionist
Oct 12, 2013
4,423
40,922
113
Hugo, MN
An update to our Porter Cable collection. Just added the Big flood light using a gift card I received for my bday.
Got the smaller light this last year along with the shopvac and radio-charger.

Now we see they offer a 1/2" impact so that and the sabre saw are still on the "need to get" list. :pirate:

View attachment 58953
I got a Ryobi LED flood light like that. When the battery goes dead, It has a 120vac plug. I like it.
 

DSS

Prince of Tater Island
Jan 10, 2012
213,700
347,660
113
Canada; where men are men and Cjcocn© is a midget
Now I know who built the Menards' brand Masterforce stuff I have.

Really considering going Milwaukee though, could sail my MF stuff to a friend. Milwaukee has a 600 ft lb impact, the big PC is just over 1/2 that.
They got a 1/2'' dr supposed to be 1400. I'd have to see it working.
 

Sawbonz

Well-Known Member
Feb 18, 2014
902
8,608
93
Foothills of Stevens Pass PNW
Finally making a push to get some walls in and insulation on 1st floor. Had that room stuffed with things so had to move my drum kit to 3rd floor for a while. When the bottom is done the Ludwigs will go back down.

You can see the two stacks of the 1/8" pressboard paneling waiting to do the walls upstairs. I think we scored about 150 sheets of that stuff for about a buck or less each at the auction.

View attachment 61044drum 2.jpg